Hot New Products Busbar Chassis Assembly - High Quality Cheap Terminals Panel Board Mcb Busbar Pan Assembly – Up Electrical Detail:
In electrical systems subject to the installation requirements stipulated in DIN VOE 0100 or IEC 60204-1 / EN 60204-1/VDE 0113-1 & IEC 60439, neutral, protective earth or phase conductors are often connected to central bus bars. This requires clear labeling of the conductor or the terminal block to the corresponding circuit.
The connection terminal blocks fulfill these conditions in two ways:
-By marking each terminal block individually
-By their blue, green-yellow or black colored housings
Type & Specifications
Model |
Connect Size(mm) Thickness x Width |
Outline Size(mm) Thickness x Width |
Bus bar Size(mm) Length x Width x Height |
UP1-125A|6W | 2×5 | 2×20 | 126x49x46 |
UP1-125A/12W | 2×5 | 2×20 | 180x49x46 |
UP1-125A/18W | 2×5 | 2×20 | 234x49x46 |
UP1-125A/24W | 2×5 | 2×20 | 288x49x46 |
UP1-125A/30W | 2×5 | 2×20 | 342x49x46 |
UP1-125A/36 W | 2×5 | 2×20 | 396x49x46 |
UP1-125A /42 W | 2×5 | 2×20 | 450x49x46 |
UP1-125A/48 W | 2×5 | 2×20 | 504x49x46 |
UP1-125A/54W | 2×5 | 2×20 | 558x49x46 |
UP1-125A /60 W | 2×5 | 2×20 | 612x49x46 |
UP1-125A/6W | 3×5 | 3×20 | 126x49x46 |
UP1-250A/12W | 3×5 | 3×20 | 180x49x46 |
UP1-250A/18W | 3×5 | 3×20 | 234x49x46 |
UP1-250A/24W | 3×5 | 3×20 | 288x49x46 |
UP1-250A/30W | 3×5 | 3×20 | 342x49x46 |
UP1-250A/36W | 3×5 | 3×20 | 396x49x46 |
UP1-250A I 42W | 3×5 | 3×20 | 450x49x46 |
UP1-250A/48W | 3×5 | 3×20 | 504x49x46 |
UP1-250A/54W | 3×5 | 3×20 | 558x49x46 |
UP1-250A /60W | 3×5 | 3×20 | 612x49x46 |
Product Details
Product detail pictures:
Related Product Guide:
Our intention should be to fulfill our consumers by offering golden provider, superior price and superior quality for Hot New Products Busbar Chassis Assembly - High Quality Cheap Terminals Panel Board Mcb Busbar Pan Assembly – Up Electrical, The product will supply to all over the world, such as: Hungary, United States, Lesotho, In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we will continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.
By Gloria from Boston - 2018.12.10 19:03
The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
By Karl from Kazakhstan - 2018.06.09 12:42